Full-scale testing of new technical solutions for a furnace water-wall system and full-opening separator for a P-50R boiler of a 330-MW power unit
A. L. ShvartsJSC “All-Russian Thermotechnical Institute”, Moscow, RussiaA. A. ChugreevJSC “All-Russian Thermotechnical Institute”, Moscow, RussiaO.B. OttJSC “All-Russian Thermotechnical Institute”, Moscow, Russia
ABI
Abstract
No abstract available.
Topics
Identifiers
Citations and references
Cited by 00 references
Metrics — AkademScholar · Coming soon