Skip to main content
Article

Methods of extending the collector’s operation period

Oybek MuratovTashkent institute of irrigation and agricultural mechanization engineers, 100000, Tashkent, UzbekistanA. MuratovTashkent institute of irrigation and agricultural mechanization engineers, 100000, Tashkent, Uzbekistan
ABI

Abstract

In the given article, the study results of various damage (landslides, shifts, collapses, etc.) of slopes and channels of collectors of reclamation systems before the turnaround time in the Syrdarya and Zhizakh regions, as well as a theoretical analysis of methods to prevent possible deformations of both man-made and as a result of human activity are presented. In this article, the employees of the Jizzakh and Syrdarya reclamation expeditions (as well as other regions), when providing information on design and estimate documentation on the conditions for unjustified mowing of coarse-stemmed plants growing in the impermeable part of the collector-drainage networks, is the basis for specifying the project as a technical and technological requirement.

Topics

Identifiers

Citations and references

Cited by 05 references
Metrics — AkademScholar · Coming soon