← Back to work
Works cited by this work
31 works
Work: An express assessment of the technical condition of an oil-filled power transformer using a simulation model based on the vibroacoustic parameters of the transformer tank
Products
For developers
AkademBaseOpen API for the ecosystem31 works
Work: An express assessment of the technical condition of an oil-filled power transformer using a simulation model based on the vibroacoustic parameters of the transformer tank