Skip to main content
Article

AN INTEGRATED AHP–TOPSIS–KNAPSACK–LLM HYBRID MODEL FOR PROJECT PORTFOLIO OPTIMIZATION

Azizbek Rafiq ugli ShamsiyevMaster's student, Digital Economy and Agrotechnologies University, Tashkent, Uzbekistan
ABI

Abstract

This paper proposes an integrated four-component hybrid pipeline for project portfolio optimization that combines the Analytic Hierarchy Process (AHP) for criterion weighting, TOPSIS for alternative ranking, 0/1 Knapsack dynamic programming for budget-constrained optimal selection, and GPT-4o based large-language-model (LLM) scoring for quantifying qualitative project documents. The mathematical apparatus, overall computational complexity O(n·m + n·B), and Design Science Research based experimental protocol are formalized. Validation is planned on a synthetic dataset of 20 projects across 30 replications against three baselines (pure NPV greedy, greedy heuristic, and pure MCDM). Four falsifiable hypotheses (H1–H4) are tested using paired t-tests, the Wilcoxon signed-rank test, and Monte Carlo sensitivity analysis. The novelty of the work lies in being the first fully integrated AHP+TOPSIS+0/1 Knapsack+LLM pipeline reported in the literature, with direct applicability to the IT initiatives planned under the "Digital Uzbekistan 2030" strategy.

Topics

Identifiers

Citations and references

Cited by 00 references
Metrics — AkademScholar · Coming soon