← Back to work
Works citing this work
3 works
Work: Real time aggregation control of P2H loads in a virtual power plant based on a multi-period stackelberg game
Modeling of calculations on the performance optimization of a double-flash geothermal renewable energy-based combined heat/power plant coupled by transcritical carbon dioxide rankine cycle
Yuchi Leng, Shuguang Li, Yasser Elmasry +6
ArticleThermodynamic and Exergetic Analyses of Power and Cooling SystemsRenewable Energy20240 citationsABI