Skip to main content
Article

Calculate the reliability of the bts-bsc network with the reserved line connection

2021en
ABI

Abstract

The issue of reserving communication lines between the base station and the mobile network base station controller which are considered as one system is considered. Analytical expressions have been developed for calculating the reliability of the system for various options for backing up communication lines between the base station and the base station controller. The results of research and calculations of reliability for ten different types of backup communication lines of the base station and the base station controller are presented.

Identifiers

Citations and references

Cited by 20 references