Skip to main content
Article

Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method

Mahyar AlimianSchool of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, IranVahidreza GhezavatiSchool of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, IranReza Tavakkoli‐MoghaddamSchool of Industrial Engineering, College of Engineering, University of Tehran, Tehran, IranReza RamezanianDepartment of Industrial Engineering, K. N. Toosi University of Technology, Tehran, Iran
2022en
ABI

Abstract

No abstract available.

Identifiers

Citations and references

Cited by 20 references