← Back to work
Works citing this work
3 works
Work: Improving the parameters of drilling and blasting operations during the sinking of the vertical shaft of the second tier of the Sev at the Pskem HPP
Products
For developers
AkademBaseOpen API for the ecosystem3 works
Work: Improving the parameters of drilling and blasting operations during the sinking of the vertical shaft of the second tier of the Sev at the Pskem HPP