← Back to work
Works citing this work
2 works
Work: Determination of resistance to gravity of working body with the pit softener installed in the two-layer plow during the main tillage
Products
For developers
AkademBaseOpen API for the ecosystem2 works
Work: Determination of resistance to gravity of working body with the pit softener installed in the two-layer plow during the main tillage