Skip to main content
Article

Collaborative scheduling of energy-saving spare parts manufacturing and equipment operation strategy using a self-adaptive two-stage memetic algorithm

Qiang LuoState Key Laboratory of Advanced Design and Manufacturing for Vehicle Body, Hunan University, Changsha 410082, ChinaQianwang DengState Key Laboratory of Advanced Design and Manufacturing for Vehicle Body, Hunan University, Changsha 410082, ChinaHuining ZhuangState Key Laboratory of Advanced Design and Manufacturing for Vehicle Body, Hunan University, Changsha 410082, ChinaGuiliang GongDepartment of Mechanical and Electrical Engineering, Central South University of Forestry and Technology, Changsha 410004, ChinaQing FanState Key Laboratory of Advanced Design and Manufacturing for Vehicle Body, Hunan University, Changsha 410082, ChinaXiahui LiuState Key Laboratory of Advanced Design and Manufacturing for Vehicle Body, Hunan University, Changsha 410082, China
2023en
ABI

Abstract

No abstract available.

Identifiers

Citations and references

Cited by 20 references