The behaviour of a two-component backfilling grout used in a Tunnel-Boring Machine

Daniele PeilaPolytechnic University of TurinLuca BorioPolytechnic University of TurinSebastiano PelizzaPolytechnic University of Turin
ABI

Аннотация

The instantaneous filling of the annulus that is created behind the segment lining at the end of the tail during the TBM advance is an operation of paramount importance. Its main goal is to minimize the surface settlements due to any over-excavation generated by the passage of the TBM. To correctly achieve the goals, a simultaneous backfilling system and the injected material should satisfy the technical, operational and performance characteristics. A two-component system injection for the back-filling is progressively substituting the use of traditional mortars. In this paper different systems of back-filling grout and in particular the two-component system are analyzed and the results of laboratory tests are presented and discussed

Темы

Цитирования и источники

Показатели — AkademScholar · Скоро