← Назад к работе
Работы, на которые ссылается эта работа
Работ: 23
Работа: Bank destruction in the middle section of the Amudarya River
Dynamics of the hydraulic and alluvial regime of the lower reaches of the Amudarya after the commissioning of the Takhiatash and Tuyamuyun hydrosystems
Bazarov Dilshod, Irina Markova, Shukhrat Sultanov +2
СтатьяEngineering and Agricultural InnovationsIOP Conference Series Materials Science and Engineering2021Цитирований: 49ABIAvanepneumatic motor modification to reduce torque ripples
V. M. Bozrov, V. I. Ivlev, S Semenov
Статья2020Цитирований: 26ABIMultidimensional Data Analysis in the Assessment of Ice-Jam Formation in River Basins
Статья2019Цитирований: 10ABIThe role of inspection of hydraulic structures in the assessment of their technical condition
Статья2020Цитирований: 10ABI