← Назад к работе
Работы, цитирующие эту работу
Работ: 8
Работа: Improvement of the Control Relay Blocks in the Electrical Centralization and Control System Based on Modern Elements
Creation of unit for monitoring status of receiving-sending tracks of electrical centralization system at railway station on basis of non-contact elements
Janibek F. Kurbanov, Natalya В. Yaronova, Eldorbek G. Khujamkulov +1
СтатьяAdvanced Research in Systems and Signal ProcessingAIP conference proceedings2025Цитирований: 1ABI