Перейти к основному содержанию
AkademIndex

Продукты

Для разработчиков

AkademBaseОткрытый API экосистемы
Статья

Interconnection of influent channel and pumping station units

Oleg GlovatskiyTashkent Institute of Irrigation and Agricultural Mechanization Engineers, Waterpower exploitation and pumping stations, 100000, Tashkent, Kara-Niyaziy strTemur DjavburiyevTashkent Institute of Irrigation and Agricultural Mechanization Engineers, Waterpower exploitation and pumping stations, 100000, Tashkent, Kara-Niyaziy strZiyoda UrazmukhamedovaTashkent Institute of Irrigation and Agricultural Mechanization Engineers, Waterpower exploitation and pumping stations, 100000, Tashkent, Kara-Niyaziy strAlexander GazaryanTashkent Institute of Irrigation and Agricultural Mechanization Engineers, Waterpower exploitation and pumping stations, 100000, Tashkent, Kara-Niyaziy strFarkhod AkhmadovTashkent Institute of Irrigation and Agricultural Mechanization Engineers, Waterpower exploitation and pumping stations, 100000, Tashkent, Kara-Niyaziy str
E3S Web of Conferencesjournal2019en
ABI

Аннотация

This paper reports on the results obtained the priority recommended strategy for carrying out reconstructive work aimed of the reliability control and safety of Jizzakh main pumping station. It has been established that the safe operation level of Jizzakh main pumping station is supported under the following conditions: The watermark in the pump station forebay are not lower than 314.55 and watermark in the headpond is not higher than 337.80 and not lower than 336.90 for the main units. At the station, no more than 5 “main” and 2 “subsidiary” units work, one “main” unit must be constantly in reserve.

Перевод пока недоступен

Темы

Идентификаторы

Цитирования и источники

Цитирований: 18Использованных источников: 0