Перейти к основному содержанию
AkademIndex

Продукты

Для разработчиков

AkademBaseОткрытый API экосистемы
Статья

Performance Measurment and Lead-Time Reduction in EPC Project-Based Organizations: A Mathematical Modeling Approach

Matina GhasemiMazyar Ghadiri NejadNaif AlsaadiIndustrial Engineering Department Faculty of Engineering Rabigh Branch, King Abdulaziz University, Jeddah 21589, Saudi ArabiaMu’tasim Abdel-JaberDepartment of Civil Engineering, Al-Ahliyya Amman University, Amman, JordanMohd Shukri Ab YajıdManagement & Science University, Shah Alam, Selangorm, MalaysiaMd. Mamun HabibSchool of Business and Entrepreneurship, Independent University, Dhaka, Bangladesh
2022en
ABI

Аннотация

To characterize the process of lead-time reduction in EPC project-based organizations, including the engineering, procurement, and construction activities, various elements such as organizational issues, firm resources, used methods and techniques, and performance measuring tools are important. In this study, the four mentioned elements are evaluated through a survey in different EPC project-based organizations. The survey is sent to only experts and managers who are involved in EPC projects, and the obtained data is used to test the relationship between the mentioned variables and the lead time of developing new products. This evaluation is followed by a set of generalized lessons learned and courses of action to improve the development process. Additionally, the attributes of performance measurement in such projects are scrutinized. Therefore, to analyze the impacts of the mentioned variables and their variations on the performance measurement, a mathematical model based on the fuzzy approach is developed. The results show that all of the four considered variables are correlated to the lead time and affect the quality perceived by the main client and the cost of the project. Moreover, data obtained from the proposed mathematical formulations illustrated that the fuzzy modeling approach is an effective method to predict the performance measurement level when the levels of the input variables are given.

Перевод пока недоступен

Идентификаторы

Цитирования и источники

Цитирований: 2Использованных источников: 0