Reducing the cost of backfill in the Kauldi gold mine
Аннотация
Abstract The Kauldi gold mine uses the backfill to control the mining pressure. Backfill should be able to effectively manage the pressure of the deposit, ensuring safe working conditions, easier preparation process as well as little funds. The cost of backfill directly affects the cost of ore and is important for the indicators of economic development of the mining enterprise. In this article, the method of reducing the costs spared by making changes to the composition of the backfill used in the Kauldi gold mine has been studied. Ore extraction is carried out in the stopes. After the primary stope is extracted and filled with backfill, the secondary backfill is extracted and filled. In the proposed method, 1/3 of the primary stope and 2/3 of the secondary stope are filled with burden. The remaining parts are left unchanged. The reason for such a distribution of the burden in the stopes is that if the backfill in the primary stope is not sufficiently solid, the ore can also be diluted and the backfill is broke-down when extracting the secondary stope. If this happens, the ore will degrade and cause excessive backfill costs for the secondary stope. Filling the stopes with burden is considered cost-effective, and in general, the amount of cement, sand, as well as marble waste purchased for the mining enterprise is reduced twice. As a result, the costs spent on them will also be reduced twice.
Перевод пока недоступен