Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method
Mahyar AlimianSchool of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, IranVahidreza GhezavatiSchool of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, IranReza Tavakkoli‐MoghaddamSchool of Industrial Engineering, College of Engineering, University of Tehran, Tehran, IranReza RamezanianDepartment of Industrial Engineering, K. N. Toosi University of Technology, Tehran, Iran
2022en
ABI
Аннотация
Аннотация отсутствует.
Идентификаторы
Цитирования и источники
Цитирований: 2Использованных источников: 0