Перейти к основному содержанию
AkademIndex

Продукты

Для разработчиков

AkademBaseОткрытый API экосистемы
Статья

Long-term monitoring of earth dam of the Charvak hydroelectric power plant (HPP) considering the water level of the reservoir

Klara SalyamovaInstitute of Mechanics and Seismic Stability of Structures of the Academy of Sciences of the Republic of Uzbekistan, Durmon Yuli str., 33, 100125 Tashkent, UzbekistanEkaterina AnInstitute of Mechanics and Seismic Stability of Structures of the Academy of Sciences of the Republic of Uzbekistan, Durmon Yuli str., 33, 100125 Tashkent, UzbekistanNematilla NishonovInstitute of Mechanics and Seismic Stability of Structures of the Academy of Sciences of the Republic of Uzbekistan, Durmon Yuli str., 33, 100125 Tashkent, UzbekistanKomil ToshmatovKhusanboy TurdikulovFergana Polytechnic Institute, Fergana str., 86, 150107 Fergana, Uzbekistan
E3S Web of Conferencesjournal2023en
ABI

Аннотация

A numerical method for determining the settlement and stress-strain state (SSS) of high earth dam of the Charvak hydroelectric power plant is developed based on the finite element method (FEM). The results were compared with the available data from long-term field observations and with records of continuous geodetic monitoring of the dam behavior based on processed space radar images obtained from the Sentinel-1 satellite. To conduct calculations, OJSC Gidroproekt of the Republic of Uzbekistan provided the structural and piecewise non-homogeneous physical and mechanical characteristics of soil of the structure body. The results of calculations of vertical displacements, normal stresses, and pore pressure were compared with field observation data for the section in which the corresponding control and measuring equipment was installed. A cause-and-effect relationship was identified between the water level in the reservoir and the deformation of the dam. The difference between the theoretical results obtained and field observations was up to 10%. A comparison of the results obtained using the finite element analysis calculations (taking into account the level of water filling in the reservoir) with the actually measured deformations of the dam during the filling of the reservoir, and with processed space monitoring data depending on the time of year, showed a good agreement between the measured and calculated displacements.

Перевод пока недоступен

Темы

Идентификаторы

Цитирования и источники

Цитирований: 4Использованных источников: 0