← Назад к работе
Работы, цитирующие эту работу
Работ: 3
Работа: Comparison of road damage analysis using PCI method and Bina Marga method and the analysis of road improvement methods using the road pavement design manual (Case study: Citayam – Parung road)
Calculation of retaining walls for highway bridge approach embankments (example of a bridge at the 14th km of the Andijan-Khrabek highway)
Fakhriddin Zokirov, Lintang Dian Artanti, Guldora Mustaeva +4
СтатьяAdvanced Energy Technologies and Civil Engineering InnovationsAIP conference proceedings2026Цитирований: 0ABI