Перейти к основному содержанию
AkademIndex

Продукты

Для разработчиков

AkademBaseОткрытый API экосистемы
Статья

Hydraulic research of the operational water supply tunnel of pskom hydrousel

Aybеk ArifjanovTashkent Institute of Irrigation and Agricultural Mechanization Engineers, National Research University, Kari-Niyaziy, 39, 100000 Tashkent, UzbekistanT ApakhodjaevaTashkent Institute of Irrigation and Agricultural Mechanization Engineers, National Research University, Kari-Niyaziy, 39, 100000 Tashkent, UzbekistanDilshod MatkaziyevTashkent Architecture and Civil Engineering University, Faculty of Technology, Yangishakhar Street, 9, 100194 Tashkent, Uzbekistan
E3S Web of Conferencesjournal2023en
ABI

Аннотация

This article analyzes the hydraulic processes in the spillway tunnels of high-pressure hydraulic units. The conducted studies involve the examination of the spatial model of the Pskom HPP production spillway tunnel section and address one of the issues that arise during the efficient operation of high-pressure facilities: hydraulic processes in the spillway tunnel. Based on the observed studies, it can be stated that calculated values of hydraulic resistances in the diaphragms are presented. These diaphragms are designed to reduce the energy of the flow while ensuring the permeability and hydraulic efficiency of the operational discharge of water. As a result of the calculations, resistances along the length of the operational spillway and the head loss on local resistances in the diaphragm were computed, and resistance coefficients were also estimated.

Перевод пока недоступен

Темы

Идентификаторы

Цитирования и источники