Перейти к основному содержанию
AkademIndex

Продукты

Для разработчиков

AkademBaseОткрытый API экосистемы
Статья

Energy management strategy of microgrid based on photovoltaic and energy storage system in construction area of Sichuan-Tibet Railway

Na ShuShandong Electric Power Engineering Consulting Institute Corp, Shandong, 250100, ChinaShan JiangShandong Electric Power Engineering Consulting Institute Corp, Shandong, 250100, ChinaZhongze FanShandong Electric Power Engineering Consulting Institute Corp, Shandong, 250100, ChinaXiaoman CaoShandong Electric Power Engineering Consulting Institute Corp, Shandong, 250100, ChinaZeling Zhang
2024en
ABI

Аннотация

The construction area of the Sichuan-Tibet Railway is located at a high altitude with thin air conditions, but it benefits from excellent solar irradiance. To address issues such as insufficient power and low efficiency of traditional fuel-based equipment in such harsh environments, electric equipment is being employed as a replacement for conventional fuel-based equipment. In order to achieve sustainable development for the Sichuan-Tibet Railway, this article proposes that a microgrid can be conducted in the construction area of the Sichuan-Tibet Railway which will provide power to the electric equipment during the construction process and to electric locomotives upon completion. This article compares the characteristics of AC microgrids and DC microgrids, analyses and simulates the mathematical model of key converters, and introduces their control strategies. This article adopts a hybrid AC-DC microgrid for research purposes and proposes a time-period-controlled energy management strategy for the photovoltaic-storage hybrid AC-DC microgrid in the construction area of the Sichuan-Tibet Railway. The simulation results demonstrate that the AC-DC microgrid in the construction area based on the proposed time-period-controlled energy management strategy could effectively meet the load demands of different time periods and provide power to the electric equipment used in the construction area of the Sichuan-Tibet Railway.

Перевод пока недоступен

Идентификаторы

Цитирования и источники

Цитирований: 2Использованных источников: 0