← Ишга қайтиш
Ушбу ишга иқтибос қилган ишлар
3 та иш
Иш: Improving the parameters of drilling and blasting operations during the sinking of the vertical shaft of the second tier of the Sev at the Pskem HPP
Маҳсулотлар
Ишлаб чиқувчилар учун
AkademBaseЭкотизим учун очиқ API3 та иш
Иш: Improving the parameters of drilling and blasting operations during the sinking of the vertical shaft of the second tier of the Sev at the Pskem HPP