Asosiy kontentga oʻtish
Hisobot

TEXAS A AND M UNIVERSITY NUCLEAR SCIENCE CENTER. Progress Report No. 8, January 1-December 31, 1971.

Jeffrey RandallInstitute for Nuclear Science and Technology
1972en
ABI

Annotatsiya

instrumentation is being expanded, and the pneumatic system controller developed for Lab No. 4 is now in use in the Center for Trace Characterization (CTC) and Shell Development labs. Several operational problems occurred in 1984 but did not result in a significant loss of reactor operating time. During this reporting period there were no changes made to the site area; however, there has been made a proposal to extend the runway at nearby Easterwood Airport such tha larger aircraft can be accommodated. This extension should occur in 1985 and should have no affect on the air traffic patterns relative to the NSC. Administratively during 1984 efforts have been made to stabilize the reactor operations staff following the mid year resignations of both a Reactor Supervisor and Manager of Reactor Operations. A long term replacement has been hired to fill the vacated Reactor Supervisor position; however, the manager position has not yet been filled and those duties have been assumed by the Assistant Director.

Hali tarjima qilinmagan

Identifikatorlar

Iqtiboslar va manbalar

0 ta iqtibos0 ta foydalanilgan manba