Intelligent Prediction and Adaptive Control of Cutter Wear for Pipe Jacking Machines in Complex Geological Conditions

Yungen HeZhejiang Electric Power Construction Co., Ltd., 315016 Ningbo, ChinaYajing LiuZhejiang Provincial Energy Group Co., Ltd., 310000 Hangzhou, ChinaYimin WanNational & Local Joint Engineering Research Center of Harbour Oil & Gas Storage and Transportation Technology, Zhejiang Ocean University, 316022 Zhoushan, ChinaHongfang LüState Key Laboratory of Advanced Marine Materials, Ningbo Institute of Materials Technology and Engineering, Chinese Academy of Sciences, Ningbo 315201, ChinaJ.B. ToshovTashkent State Technical University, Tashkent 100095, Republic of UzbekistanJian WangZhejiang Provincial Ocean Wind Power Development Co., Ltd., 325000 Wenzhou, ChinaXiang LiZhejiang Baimahu Laboratory Co., Ltd., 310051 Hangzhou, ChinaBohong WangNational & Local Joint Engineering Research Center of Harbour Oil & Gas Storage and Transportation Technology, Zhejiang Ocean University, 316022 Zhoushan, China
2026en
Ochiq kirishOlmos

Litsenziya: cc-by-nc-nd

ABI

Annotatsiya

Pipe jacking is widely used in urban underground pipe networks and cross-region pipeline projects. Conventional inspection and replacement practices based on fixed distances or experience cannot track changing ground conditions and tool status in real time, particularly under complex ground conditions. Cutting tools can experience abnormal wear or fail, resulting in unplanned stoppages, reduced tunnelling efficiency, and increased project risk. This study proposes and validates a framework for intelligent management of cutting-tool wear in pipe jacking machines by combining multi-source monitoring, machine learning, and adaptive decision-making. The proposed system adopts an offline retrospective validation mode, in which prediction performance was evaluated on historical project data and control strategies were verified in a simulation environment. First, a data acquisition system was established to integrate machine operating parameters, geotechnical and mechanical properties, and slurry-system information. An attention-based long short-term memory (LSTM) model was developed to learn from these data and achieve accurate time-series prediction of tool wear. Then, an adaptive control strategy was designed to dynamically optimize tunneling parameters and to plan the tool-replacement window effectively. The proposed framework was validated on a natural gas pipeline pipe-jacking project (DN2200, jacking length 268 m) containing fully weathered, strongly weathered, and moderately weathered granite strata. The results show that the proposed system outperforms traditional methods in tool-wear prediction (RMSE reduced to 1.12 mm and R² increased to 0.915), tunneling efficiency (increased by about 14.7%), and risk management. This work presents a model and a practical technical approach for more intelligent management of pipe-jacking construction.

Hali tarjima qilinmagan

Identifikatorlar

Iqtiboslar va manbalar