Asosiy kontentga oʻtish
Maqola

АМУ-БУХОРО МАШИНА КАНАЛИДА ЛОЙҚА ОҚИЗИҚЛАРНИ БОШҚАРИШ ВА ГИДРОТЕХНИКА ИНШООТЛАРИНИ ЭКСПЛУАТАЦИЯ ҚИЛИШ САМАРАДОРЛИГИНИ ОШИРИШ

2026en
Ochiq kirishGibrid

Litsenziya: cc-by

ABI

Annotatsiya

The article examines the management of silt sediment within the Amu-Bukhara Machine Canal (ABMC) system and the resulting improvement in the operational efficiency of its hydraulic structures. Based on long-term monitoring data for 2016–2023, it was established that an average of 13–17 million m³ of silt sediment enters the canal annually through the main headworks, of which 78–83% settles within the canal. Using the 5–8-fold gap between the rated and actual (site) productivity of dredgers, an improved method for planning desilting works was proposed, and the efficiency of operating several dredgers in parallel was calculated: three dredgers reduce the time required to clear 280,000 m³ of sediment by a factor of 2.9 compared with a single dredger.

Hali tarjima qilinmagan

Identifikatorlar

Iqtiboslar va manbalar

0 ta iqtibos0 ta foydalanilgan manba