Physico-Analytical Modeling of an Industrial Low-Temperature Natural Gas Separation Line with Three-Section Cold Recovery and Propane Cooling

Akmalbek AbdusalomovDepartment of Computer Engineering, Gachon University Sujeong-Gu, Seongnam-si 13120, Gyeonggi-Do, Republic of KoreaHusan IgamberdiyevDepartment of Information Processing and Control Systems, Tashkent State Technical University, Tashkent 100095, UzbekistanShaxzod AmirovDepartment of Information Processing and Control Systems, Tashkent State Technical University, Tashkent 100095, UzbekistanUktam MamirovDepartment of Information Processing and Control Systems, Tashkent State Technical University, Tashkent 100095, UzbekistanJasur SevinovDepartment of Computer Engineering, University of Tashkent for Applied Sciences, Tashkent 100149, UzbekistanMukhriddin MukhiddinovDepartment of Industrial Management and Digital Technologies, Nordic International University, Tashkent 100128, UzbekistanSabina UmirzakovaDepartment of Computer Science, Chungbuk National University, Cheongju 28644, Republic of KoreaTeag Keun WhangboDepartment of Computer Engineering, Gachon University Sujeong-Gu, Seongnam-si 13120, Gyeonggi-Do, Republic of Korea
2026en
Ochiq kirishOltin

Litsenziya: cc-by

ABI

Annotatsiya

This study develops and tests a first-principles dynamic model of an industrial low-temperature separation (LTS) train with three-section cold recovery and propane refrigeration (LTS-4 line, Mubarek Gas Processing Plant). Mass, energy and hydraulic balances of the coolers, the recuperators 20T-01 and 20T-02A–C (including tube-wall heat capacity), the separators and the propane evaporator are coupled with Peng–Robinson phase-equilibrium relations into an index-1 differential-algebraic system with 13 + 12N states. A 58-state thermal core was calibrated on 5 h and validated on 7 h of 2 min supervisory control and data acquisition (SCADA) records that include a 19% throughput step. The 20C-01 gas temperature was predicted with a validation root-mean-square error of 0.49 K (R2 = 0.93), against 1.89 K for a persistence predictor. The linearized core is asymptotically stable; the wall heat capacity, 14.5 times the gas holdup, raises the slowest time constant from 2.4 to 15.2 min. The return-gas loop amplifies the evaporator response to propane-temperature changes by 33%, and one cell per section underestimates the cascade effectiveness (0.64 versus 0.81). Cold-section temperatures were not reproduced (bias up to −5.4 K), indicating an unmeasured disturbance and the need for inter-section measurements.

Hali tarjima qilinmagan

Identifikatorlar

Iqtiboslar va manbalar

0 ta iqtibos0 ta foydalanilgan manba