Asosiy kontentga oʻtish
Maqola

A hierarchical-decoupled parallel optimization algorithm for power-minimizing operation of hydrogen-blended natural gas pipeline networks

Feng-Miao XuHubei Key Laboratory of Low-Carbon and Safe Storage & Transportation of Oil, Gas and New Energy, Yangtze University, Wuhan, 430100, Hubei, ChinaLili ZuoSchool of Mechanical and Storage and Transportation Engineering, China University of Petroleum (Beijing), Beijing, 102249, ChinaAn-Tai JinOil & Gas Storage and Transportation Planning and Research Section, PetroChina Planning and Engineering Institute, Beijing, 100083, ChinaFeng ChenHubei Key Laboratory of Low-Carbon and Safe Storage & Transportation of Oil, Gas and New Energy, Yangtze University, Wuhan, 430100, Hubei, ChinaQiao DengSchool of Petroleum Engineering, Yangtze University, Wuhan, 430100, Hubei, ChinaShavkat NurmatovInstitute of Material Sciences, Uzbekistan Academy of Sciences, Tashkent, 100084, UzbekistanQian ChenHubei Key Laboratory of Low-Carbon and Safe Storage & Transportation of Oil, Gas and New Energy, Yangtze University, Wuhan, 430100, Hubei, China
2026en
Ochiq kirishOlmos

Litsenziya: cc-by-nc-nd

ABI

Annotatsiya

Minimizing the total operating power for hydrogen-blended natural gas pipeline networks constitutes a challenging mixed-integer nonlinear programming problem. To tackle this challenge efficiently, a hierarchical-decoupled parallel optimization algorithm is proposed in this paper. The original mixed-integer nonlinear programming model is decoupled into an integer programming sub-model and a nonlinear programming sub-model. The integer programming sub-model uses particle swarm optimization to search for compressor station operating-unit-count combinations. Under each fixed integer decision, the nonlinear programming sub-model uses the Interior Point Optimizer to optimize compressor station discharge pressures and flow rate allocation in compressor-equipped looped structures. Two mechanisms are introduced to accelerate the solution process. Historical nonlinear programming sub-model results are reused for previously evaluated compressor station operating-unit-count combinations. An online incremental neural-network-based feasibility classifier is used to pre-screen candidate combinations predicted as infeasible. In addition, the feasibility classifier is trained asynchronously in parallel with nonlinear programming sub-model solving to avoid serial waiting. Results show that the proposed algorithm achieves a mean total operating power of 62.31±3.43 MW while reducing the mean total solution time by 73.59% compared with particle swarm optimization. The acceleration mechanisms reduce the actual number of nonlinear programming sub-model calls by up to 33.85%. Sensitivity analysis under different hydrogen-blending ratios further shows that the developed model can reflect gas-composition-induced changes in gas physical properties and pipeline pressure drop, while the proposed algorithm can generate optimized operation schemes consistent with the gas transmission process.

Hali tarjima qilinmagan

Identifikatorlar

Iqtiboslar va manbalar