Asosiy kontentga oʻtish
AkademIndex

Mahsulotlar

Ishlab chiquvchilar uchun

AkademBasetez oradaEkotizim uchun ochiq API
Lotin
Maqola

Attention to Land Reclamation in the Years of Stagnation in the Republic of Uzbekistan

Абдурасул БолтаевCandidate of Historical Sciences, Associate Professor, Jizzakh State Pedagogical Institute 2,
ABI

Annotatsiya

The “Farkhod Hydroelectric Power Station” which was built in Syrdarya region has irrigated 700,000 hectares of fertile land in Dalvarzin and Mirzachul districts of Uzbekistan, Tajikistan and Kazakhstan. “Andijan water reservoir” was built in the Karadarya River of Fergana Valley, and a hydroelectric power plant with a capacity of 140,000,000 kilowatt-hours was commissioned. Due to the commissioning of “Tuyamuyin” waterworks in the lower reaches of the Amudarya River, it was possible to irrigate 300,000 hectares of land in the Republic of Turkmenistan and Uzbekistan, as well as 200,000 hectares of new land for rice and cotton growing. In addition, this water facility has protected the land from erosion and provided with 150,000 kilowatts of electricity.

Mavzular

Identifikatorlar

Iqtiboslar va manbalar

0 ta iqtibos0 ta foydalanilgan manba
Koʻrsatkichlar — AkademScholar · Tez orada