Methods of extending the collector’s operation period

Oybek MuratovTashkent institute of irrigation and agricultural mechanization engineers, 100000, Tashkent, UzbekistanA. MuratovTashkent institute of irrigation and agricultural mechanization engineers, 100000, Tashkent, Uzbekistan
ABI

Annotatsiya

In the given article, the study results of various damage (landslides, shifts, collapses, etc.) of slopes and channels of collectors of reclamation systems before the turnaround time in the Syrdarya and Zhizakh regions, as well as a theoretical analysis of methods to prevent possible deformations of both man-made and as a result of human activity are presented. In this article, the employees of the Jizzakh and Syrdarya reclamation expeditions (as well as other regions), when providing information on design and estimate documentation on the conditions for unjustified mowing of coarse-stemmed plants growing in the impermeable part of the collector-drainage networks, is the basis for specifying the project as a technical and technological requirement.

Hali tarjima qilinmagan

Mavzular

Identifikatorlar

Iqtiboslar va manbalar

Koʻrsatkichlar — AkademScholar · Tez orada