Asosiy kontentga oʻtish
AkademIndex

Mahsulotlar

Ishlab chiquvchilar uchun

AkademBaseEkotizim uchun ochiq API
Maqola

ADC-GERT network parameter estimation model for mission effectiveness of joint operation system

Fang ZhigengCollege of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, ChinaShuang WuCollege of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, ChinaZhang XiaoliCollege of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, ChinaYunke SunCollege of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China
2021en
ABI

Annotatsiya

Effectiveness evaluation of the joint operation system is an important basis for the demonstration and development of weapon equipment. With the consideration that existing models of system effectiveness evaluation seldom describe the structural relationship among equipment clearly as well as reflect the dynamic, the analog-to-digital converter-graphical evaluation and review technique (ADC-GERT) network parameter estimation model is proposed based on the ADC model and the joint operation system structure. Firstly, analysis of the joint operation system structure and operation process is conducted to build the GERT network, where equipment subsystems are nodes and activities are directed arches. Then the mission effectiveness of equipment subsystems is calculated by the ADC model. The probability transfer parameters are modified by the mission effectiveness of equipment subsystems based on the Bayesian theorem, with the ADC-GERT network parameter estimation model constructed. Finally, a case study is used to validate the efficiency and dynamic of the ADC-GERT network parameter estimation model.

Hali tarjima qilinmagan

Identifikatorlar

Iqtiboslar va manbalar

2 ta iqtibos0 ta foydalanilgan manba