Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method
Mahyar AlimianSchool of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, IranVahidreza GhezavatiSchool of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, IranReza Tavakkoli‐MoghaddamSchool of Industrial Engineering, College of Engineering, University of Tehran, Tehran, IranReza RamezanianDepartment of Industrial Engineering, K. N. Toosi University of Technology, Tehran, Iran
2022en
ABI
Annotatsiya
Annotatsiya mavjud emas.
Identifikatorlar
Iqtiboslar va manbalar
2 ta iqtibos0 ta foydalanilgan manba