Asosiy kontentga oʻtish
AkademIndex

Mahsulotlar

Ishlab chiquvchilar uchun

AkademBaseEkotizim uchun ochiq API
Maqola

Simulation of formation fluid withdrawal hydrodynamics using a downhole jet pump when studying the productive formation while well drilling

Ф И ЕрмоленкоUfa State Petroleum Technological University, Branch of the University in the City of Oktyabrsky, 54a, Devonskaya St., Oktyabrsky, Republic of Bashkortostan, 452607, Russian FederationТ Н МиннивалеевUfa State Petroleum Technological University, Branch of the University in the City of Oktyabrsky, 54a, Devonskaya St., Oktyabrsky, Republic of Bashkortostan, 452607, Russian Federation
2019en
ABI

Annotatsiya

Abstract The article discusses hydrodynamics of the reservoir fluid withdrawal from the promising drilled formation interval with the use of a jet pump installed in the internal cavity of the drill pipe string in the wellbore bottom-hole part. The hydrodynamic problem of fluid production is solved. The solution connects the dynamics of injected, recoverable and upward flows of the circulating system.

Hali tarjima qilinmagan

Identifikatorlar

Iqtiboslar va manbalar

2 ta iqtibos0 ta foydalanilgan manba