Energy-saving device for temporary ditch digging
I S HasanovBukhara branch of the Tashkent Institute of Irrigation and Agricultural Mechanization Engineers, Bukhara City. Gazli ave. 32. 200100. UzbekistanJ U RuzikulovBukhara branch of the Tashkent Institute of Irrigation and Agricultural Mechanization Engineers, Bukhara City. Gazli ave. 32. 200100. UzbekistanF A ErgashovBukhara branch of the Tashkent Institute of Irrigation and Agricultural Mechanization Engineers, Bukhara City. Gazli ave. 32. 200100. UzbekistanM J ToshmurodovaBukhara branch of the Tashkent Institute of Irrigation and Agricultural Mechanization Engineers, Bukhara City. Gazli ave. 32. 200100. UzbekistanM R SotlikovaBukhara branch of the Tashkent Institute of Irrigation and Agricultural Mechanization Engineers, Bukhara City. Gazli ave. 32. 200100. Uzbekistan
ABI
Abstract
The article describes the research on the improvement of the temporary ditch digger device. In order to reduce the traction resistance of the channel and improve the channel quality, two straight discs are installed in front of the channel. During the, the slope of the temporary ditch was maintained at the required level due to the partial disintegration of the soil layer due to the rotational movement of the disc, and the issue of maintaining the uniformity of the temporary ditch - side wall was discussed.
Topics
Identifiers
Citations and references
Metrics — AkademScholar · Coming soon