Skip to main content
AkademIndex

Products

For developers

AkademBasesoonOpen API for the ecosystem
Latin
English
Article

Placement of plow working bodies for plowing soil slopes

Farmon МамаtovKarshi Institute of Irrigation and Agro technologies of the National Research University Tashkent Institute of Irrigation and Agricultural Mechanization Engineers, Karshi, 180119, UzbekistanNurbek RashidovKarshi engineering-economics institute, 225, Mustakillik str., Karshi, 180100, UzbekistanSunnat BadalovKarshi engineering-economics institute, 225, Mustakillik str., Karshi, 180100, UzbekistanDilsabo ChorievaKarshi engineering-economics institute, 225, Mustakillik str., Karshi, 180100, Uzbekistan
E3S Web of Conferencesjournal2023en
ABI

Abstract

The paper studies the direction turnover layers along slope and placement of working bodies on a plow for plowing slope fields. The diagrams of the turnover of layers on the slope and the layout of the working bodies on the plow are given. It is proved that intermittent grooves ridges, according to agro technical requirements, it is necessary to rotate the layers downhill. It was found that when installing a cut-out spherical disk behind the front cases, a groove is formed above the a is under it. The subsequent layer wrapped in an even body. At the same time, rainwater is sub-arable of soil, which prevents water erosion. The results of one-factor experiments using strain-measuring methods are presented. It has been established that to ensure complete turnover of the layers within their own furrow by the hulls and the formation of the required ridges and intermittent grooves longitudinal distance between and toe even-numbered body ploughshare should be at least 110 cm.

Topics

Identifiers

Citations and references

Cited by 07 references
Metrics — AkademScholar · Coming soon