Utilizers of the condensing heat in the boiler's unit at heat power station of Uzbekistan
Jakhongir NormuminovTashkent State Technical University Assistant Professor, Heat Power Engineering, , Universitetskaya, 2, Tashkent, 100002, UzbekistanA. I. AnarbaevTashkent Institute of Irrigation and Agricultural Mechanization Engineers, 39 Kari Niyazov, Tashkent, 100000, UzbekistanBobur XurramovTashkent State Technical University Assistant, Heat Power Engineering, , Universitetskaya, 2, Tashkent, 100002, Uzbekistan
ABI
Аннотация
The system of integrated heat supply from steam boilers using condensation heat exchangers based on thermal testing of the boiler unit TGMP-114S in the Syrdarya HPS, which is the largest heat power station in Uzbekistan with a capacity of 3200 MW, was considered. It has been calculated that the increasing of the efficiency the heat supply system for this boiler is equal to 3.4%.