Asosiy kontentga oʻtish
AkademIndex

Mahsulotlar

Ishlab chiquvchilar uchun

AkademBasetez oradaEkotizim uchun ochiq API
Lotin
Oʻzbek
Maqola

Utilizers of the condensing heat in the boiler's unit at heat power station of Uzbekistan

Jakhongir NormuminovTashkent State Technical University Assistant Professor, Heat Power Engineering, , Universitetskaya, 2, Tashkent, 100002, UzbekistanA. I. AnarbaevTashkent Institute of Irrigation and Agricultural Mechanization Engineers, 39 Kari Niyazov, Tashkent, 100000, UzbekistanBobur XurramovTashkent State Technical University Assistant, Heat Power Engineering, , Universitetskaya, 2, Tashkent, 100002, Uzbekistan
E3S Web of Conferencesjournal2020en
ABI

Annotatsiya

The system of integrated heat supply from steam boilers using condensation heat exchangers based on thermal testing of the boiler unit TGMP-114S in the Syrdarya HPS, which is the largest heat power station in Uzbekistan with a capacity of 3200 MW, was considered. It has been calculated that the increasing of the efficiency the heat supply system for this boiler is equal to 3.4%.

Mavzular

Identifikatorlar

Iqtiboslar va manbalar

Koʻrsatkichlar — AkademScholar · Tez orada